Explore products for M12 Ethernet & M12-to-RJ45 Cables
9 linked product pages
Open any product to review images, pin options and technical data.
M12 Ethernet & M12-to-RJ45 Cables: construction and selection data
Reorganized from the applicable LMConn source-catalog pages. Final dimensions, contact ratings, keying and wiring remain controlled by the approved drawing.
Mechanical and environmental data
- Ingress protection
- Depends on selected body, seal and panel interface
- Mating endurance
- Confirm for the selected contact system
- Vibration
- Confirm against the approved application specification
- Mechanical shock
- Confirm against the approved application specification
- Salt-spray reference
- Material and finish dependent
- Temperature reference
- Connector, contact and cable material dependent
- Shielding reference
- Construction and cable dependent
Construction range
cable assembly.
- Select plug, free receptacle, fixed receptacle, panel or PCB format.
- Confirm straight or right-angle cable exit and available installation space.
- Match the pin count, insert orientation, contact gender and keying to the mating component.
- Define solder, crimp, PCB or factory-molded cable termination.
- Release cable diameter, shielding, jacket, pin map and required tests on the drawing.
From connector format to a controlled configuration
- Body stylePlug or receptacle, straight, right-angle, panel or PCB construction.
- Key and shellKey orientation and shell-size family establish mechanical compatibility.
- InsertContact arrangement, contact gender and pin numbering define the electrical interface.
- MaterialsShell finish, insulator and contact material are selected for environment and duty.
- TerminationSolder, crimp, PCB, collet, cable nut or overmold completes the released build.









What M12 Ethernet & M12-to-RJ45 Cables are designed to solve
The best result comes from matching the connector and cable to the complete system—not selecting by diameter or appearance alone. This page organizes the decisions an engineer, buyer or system integrator needs to make before requesting a drawing or quotation.
LMConn groups compatible formats by locking method, interface size, contact arrangement, installation method and cable construction. This makes it possible to compare standard options while keeping project-specific details such as pin mapping, cable length, labels and validation requirements under controlled revision.
Available product directions
D-coded M12 to RJ45
Use this configuration when the equipment layout and mating interface call for d-coded m12 to rj45. Confirm the exact drawing, electrical limits and mating component before release.
X-coded M12 to RJ45
Use this configuration when the equipment layout and mating interface call for x-coded m12 to rj45. Confirm the exact drawing, electrical limits and mating component before release.
X-coded M12 to M12
Use this configuration when the equipment layout and mating interface call for x-coded m12 to m12. Confirm the exact drawing, electrical limits and mating component before release.
A-coded 8-pin to RJ45
Use this configuration when the equipment layout and mating interface call for a-coded 8-pin to rj45. Confirm the exact drawing, electrical limits and mating component before release.
High-flex Ethernet assembly
Use this configuration when the equipment layout and mating interface call for high-flex ethernet assembly. Confirm the exact drawing, electrical limits and mating component before release.
Catalog-derived parameters with original LMConn visuals
The following technical values are taken from the supplied source manuals rather than inferred from general connector practice. The accompanying image is an original LMConn presentation visual and is not a model-specific engineering drawing. Family-level data summarizes the catalog; ordering dimensions and electrical limits must still be checked against the exact model row and contact layout.
| Contact count | 3, 4, 5, 6, 8, 12 and 17 contacts |
|---|---|
| Protection rating | IP65-IP67 |
| Cable options | 26 AWG OD 6.2 mm and 22 AWG OD 6.4 mm shown |
| Interfaces | M12/RJ45, SM/RJ45 and other industrial combinations |

Product appearance varies by shell size, contact layout, mounting and cable configuration. Request the current model drawing and approved sample for final verification.
Engineering selection guide
- Choose coding from protocol and bandwidth. Record the requirement in the interface-control drawing or RFQ so it can be verified.
- Define connector A and connector B. Record the requirement in the interface-control drawing or RFQ so it can be verified.
- Specify straight/right-angle orientation. Record the requirement in the interface-control drawing or RFQ so it can be verified.
- Select static, flex or drag-chain cable. Record the requirement in the interface-control drawing or RFQ so it can be verified.
- Confirm shield continuity and length. Record the requirement in the interface-control drawing or RFQ so it can be verified.
Information that controls the design
| Decision | Questions to answer | Why it matters |
|---|---|---|
| Electrical | Signal, protocol, voltage, current, contact count and shielding? | Controls insert layout, contact size, cable and test plan. |
| Mechanical | Mounting, straight/angle exit, panel thickness, mating access? | Controls envelope, cutout and serviceability. |
| Environment | Dust, water, chemicals, temperature, vibration and mating cycles? | Controls sealing, material and strain-relief choices. |
| Cable | Static, flex, torsion, conductor size, jacket and outside diameter? | Controls backshell, gland, bend radius and lifetime. |
| Quality | Inspection, electrical test, labels, traceability and packaging? | Creates an objective acceptance standard. |
Important: Ratings differ by exact part number, contact layout, cable and assembly condition. Values shown on a family page are selection guidance, not a substitute for the approved product drawing and datasheet.
Typical applications and design priorities
PROFINET
For PROFINET, engineers normally prioritize connection security, routing space and service access. Document the mating part and operating conditions so the connector, cable and termination can be evaluated as one system.
EtherNet/IP
For EtherNet/IP, engineers normally prioritize signal integrity, environmental protection and repeatable installation. Document the mating part and operating conditions so the connector, cable and termination can be evaluated as one system.
Machine vision
For machine vision, engineers normally prioritize connection security, routing space and service access. Document the mating part and operating conditions so the connector, cable and termination can be evaluated as one system.
Industrial switches
For industrial switches, engineers normally prioritize signal integrity, environmental protection and repeatable installation. Document the mating part and operating conditions so the connector, cable and termination can be evaluated as one system.
Robot networks
For robot networks, engineers normally prioritize connection security, routing space and service access. Document the mating part and operating conditions so the connector, cable and termination can be evaluated as one system.
How to compare candidate products
Begin with non-negotiable interface requirements, then compare environmental and assembly details. Do not use a single headline rating as the sole decision. A suitable candidate should match the mating geometry, contact map, electrical load, cable construction, mounting envelope and maintenance method.
For replacement projects, send photographs only as supporting information. Measurements, existing part numbers, panel cutouts and pin assignments are needed because many circular connectors have similar external shapes. For new designs, reserve space for the connector body, coupling action, minimum cable bend radius and an operator’s hand or assembly tool.
RFQ checklist
- Target quantity, prototype quantity and annual demand.
- Connector family, mating component or interface drawing.
- Contact count, gender, coding, keying and pin assignment.
- Voltage, current, signal type, network protocol and shield strategy.
- Mounting method, panel thickness and available installation space.
- Cable type, length, conductor size, flex requirements and jacket material.
- Ingress protection, temperature, vibration and chemical exposure.
- Required tests, labeling, documentation and packaging.
Frequently asked questions
What is M12 Ethernet & M12-to-RJ45 Cables used for?
This page groups the cable searches that combine protocol, coding and end-to-end connector configuration rather than treating every M12 product as the same interface. Common uses include PROFINET, EtherNet/IP, machine vision. Final suitability depends on the selected part number and operating conditions.
How do I select the correct M12 Ethernet cable?
Start with the mating interface, electrical function and environment. Then confirm mounting, contact layout, termination, cable diameter and keying. The selection checklist on this page captures the minimum information needed for an engineering review.
Are all M12 Ethernet cable products interchangeable?
No. Products that look similar may differ in thread, shell size, keying, contact layout, insert orientation, sealing and dimensions. Always compare the complete dimensional drawing and mating-part definition.
Which specifications should I send for a quotation?
Send quantity, drawings or mating part, contact count, pinout, voltage and current, signal or protocol, cable type and length, environmental rating, mounting style and any testing or labeling requirements.
Can LMConn configure a custom version?
Configuration can cover contact layout, cable length, connector orientation, pin mapping, shielding, overmolding, labels and packaging where technically feasible. A drawing review is required before production.
How is the final part verified?
Verification should be defined by the project and may include dimensional inspection, continuity, insulation resistance, contact resistance, high-potential testing, shield continuity and visual checks. Required tests must be agreed in the specification.